Cosmetic Works
Repainting, tile replacement, joinery swaps and marble honing, with a lift booking either way.
Learn moreTwenty-six clusters, three towers to most of them, and an approval route that goes through DMCC before it ever reaches your building manager. We prepare the drawings and the document pack, then do the work: partitions, ceiling grids, lighting and power, joinery, tile, marble and washroom refits.
Trusted by businesses across Dubai






JLT means two authorities in sequence. DMCC approves the alteration on the member portal, then the tower issues its own permit through the owners association manager.
Repainting, tile replacement, joinery swaps and marble honing, with a lift booking either way.
Learn moreNew partitions, ceiling changes and door openings, where detector positions set the timeline.
Learn moreNew ways in the distribution board, extra floor boxes and relocated lighting circuits on plan.
Learn moreBetween tenancies, when normal working hours apply and the programme gets noticeably shorter.
Learn more
From the promenade the clusters look interchangeable. They are not. Permitted working hours, service lift booking, loading bay access and how long a permit stays valid are all set by whoever manages that particular tower, and in JLT that is a different company almost every time. One will allow quiet works through the day and hold noisy work to a weekend. Another issues a permit valid for ten days and will not extend it.
We measure the floor, check the ceiling grid and confirm what the building expects.
A written price against a scope, before anyone books a date.
One file to your facilities contact, with the lift slot requested.
Protection first, noisy trades early, quiet trades before the floor wakes.
Clean floor, caps off, dated photo set to your contact.
Both, and in that order. DMCC is the free zone authority, so a change to a demised unit begins as a fit-out or alteration request on the member portal. That approval alone does not put anyone on site. The tower then has to issue its own work permit, and in most JLT clusters that comes from an owners association manager appointed by the strata rather than from DMCC. A handful of towers are managed by DMCC directly. The rest set their own hours, lift rules and permit durations.
Get a free on-site inspection from our specialists and receive a fixed price before any work begins.
Fast. Simple. Reliable.
Let's take care of it for you.
Book Your Free VisitOr speak to a specialist
+971 50 469 1186 Mon to Sat, 8:00 to 19:00 GST